PV Gas Thi Vai LNG Receiving Terminal

Project: PV Gas Thi Vai LNG Receiving Terminal
Location: Tan Thanh district, Ba Ria - Vung Tau province  
Investor: Petrovietnam Gas Joint Stock Corporation
Item: Geotechnical Survey
Main contractor: Samsung C&T-PTSC Consortium
Implement time: 04/7/2019  đến 15/10/2019
Equipment: Drilling machine XY-1A & SPT, CPTu equipment, Seismic crosshole, Electric resistivity, Thermal conductivity, Plate load test, CBR test.
Quantity of work: 
- Drilling, sampling and SPT: 34 boreholes, total depth of 2069m.
- Piezocone penetration test (CPTu): 4 locations, total depth of 160m
- Seismic crosshole test: 3 locations
- Electric resistivity tests: 3 locations
- Thermal conductivity test: 3 locations
- Plate load test: 4 locations
- CBR test: 6 locations
- Geotechnical engineering report