Project: HBRE Chu Prong Wind Power Plant
Location: Chu Prong district, Gia lai Province
Investor: HBRE GIA LAI WIND POWER JOINT STOCK COMPANY
Item: Onshore Geotechnical Survey
Main contractor: PTSC G&S
Implement time: 03/02/2020 đến 28/02/2020
Equipment: Drilling machine XY-1A, SPT equipment, Electric Resistivity test, Thermal Resistivity test.
Quantity of work:
- Drilling, sampling and SPT: 13 boreholes, total depth of 325m.
- Resistivity test: 13 locations
- Thermal resistivity test: 13 locations
- Unconfined Compression test:39 samples
- Direct shear test: :36 samples
- Consolidation test (Cv): 36 samples
- Geotechnical engineering report