Project: New Phnom Penh International Airport (NPPIA)
Location: Takhmao town and Kandal Stung district, Kandal province, Cambodia
Investor: Cambodia Airport Investment Co.,Ltd
Consultancy: Arup Group Limited
Item: Geotechnical Survey
Main contractor: Power Engineering Consulting Company 2 (PECC2)
Implement time: 04/5/2019 đến 11/2019
Equipment: Drilling machine XY-1A & SPT, CPTu, SCPT, PMT, VST, PER.
Quantity of work:
- Drilling, sampling and SPT: 26 boreholes, total depth of 1546m.
- Piezocone penetration test (CPTu): 350 locations, total depth of 10610m
- Seismic Piezocone penetration test (SCPT): 26 locations
- Presuremeter tests: 149 tests
- Vane shear tests: 216 tests
- Permeability test: 6 locations
- Geotechnical engineering report