Project: Tan Thuan wind power plant project with 75MW
Location: Tan Thuan commune, Dam Doi district, Ca Mau province
Investor: CA MAU IRP J.S.C
Item: Nearshore Geotechnical Survey
Main contractor: Power Engineering Consulting Joint Stock Company 2 (PECC2)
Implement time: 03/02/2020 đến 02/4/2020
Equipment: Drilling machine XY-1A, SPT equipment, Jackup, Piezocone penetration test, Seismic logging test, Resistivity logging test, Field vane shear test.
Quantity of work:
- Drilling, sampling and SPT: 12 boreholes, total depth of 960m.
- Field vane shear test: 12 locations
- Piezocone penetration test: 18 locations
- Seismic logging test: 18 locations
- Resistivity logging test: 18 locations
- Unconfined compression test: 96 samples
- Direct shear test: 240 samples
- Consolidation test (Cv): 144 samples
- Triaxial test - UU: 144 samples
- Triaxial test – CU: 96 samples
- Geotechnical engineering report