Project: Wind Power Project Bac Lieu Phase III, Soc Trang Phase I And Ca Mau Phase I, Vietnam
Location: Bac Lieu, Soc Trang and Ca Mau Province
Investor: CÔNG TY TNHH XÂY DỰNG - THƯƠNG MẠI – DU LỊCH CÔNG LÝ
Consultancy: POWERCHINA ZHONGNAN ENGINEERING CORPORATION LIMITED
Item: Nearshore Geotechnical Survey
Main contractor: PTSC G&S
Implement time: 30/4/2018 đến 30/6/2018
Equipment: Drilling machine XY-1A, SPT equipment, Jackup, Piezocone penetration test, Field vane shear test.
Quantity of work:
- Drilling, sampling and SPT: 07 boreholes, total depth of 560m.
- Piezocone penetration test CPTu: 07 locations
- Field vane shear test: 07 locations
- Consolidation test (Cv): 93 samples
- Triaxial compression test - UU: 97 samples
- Triaxial compression test – CU: 58 samples
- Geotechnical engineering report